Case Studies

/

Offshore Field Redevelopment – Electrical Advisory

Offshore Field Redevelopment – Electrical Advisory

SAEK provided technical advisory services in electrical power systems for the redevelopment of a mature offshore field, including new infrastructure integration with existing facilities.

The engagement focused on electrification strategy, power system optimisation, and operational reliability, producing advisory outputs that ensured robust and safe integration of new and existing systems. SAEK’s consultancy approach emphasised technical studies,
equipment assessment, interface coordination, and risk-informed recommendations.

Approach & Methodology

SAEK applied a structured consultancy methodology:

Power System Studies: Performed load flow, short-circuit, stability, motor starting, and harmonics analyses across new and existing infrastructure
Electrification Advisory: Provided guidance for transitioning critical systems to electrified operation
Equipment Assessment & Obsolescence Review: Evaluated ageing electrical equipment and recommended upgrades to maintain operational reliability
Interface & Integration Advisory: Coordinated multidisciplinary inputs to ensure seamless integration across platform systems
Operational Advisory: Provided guidance on efficiency, reliability, and compliance with offshore standards

This methodology ensured a robust, safe, and optimised electrical system design, fully aligned with project objectives and engineering best practices.

Technical Governance & Advisory

SAEK’s Role:

• Guided electrical system configuration, protection schemes, and equipment selection
• Reviewed and validated technical outputs for compliance with industry best practices and regulatory standards
• Provided phased implementation recommendations and risk mitigation strategies
• Ensured technical integrity, operational reliability, and performance optimisation
throughout the project lifecycle

Outcome

The advisory engagement delivered:

• Comprehensive electrical system advisory for integration of new and existing offshore infrastructure
• Recommendations to enhance reliability, operational efficiency, and equipment lifecycle
• Identification of technical and operational risks and recommended mitigation measures
• A fully auditable advisory package supporting engineering decisions and project execution

Project Information

Client Name:

Anonymous

Category:

Power System Studies & Grid Connection Advisory

Timeline:

Oct 2023 - Nov 2023

Confidentiality Statement:

Project details have been anonymised and summarised to respect client, contractor, and commercial confidentiality obligations.